View Single Post
  #15  
Old 04-17-2019, 04:55 PM
mfoley3 mfoley3 is offline
Member
 
Join Date: Aug 2011
Posts: 87
Default

Quote:
Originally Posted by mfoley3 View Post
Hi Puma Cat, today I placed my order for new CJ gear. I have purchased:
GAT S2 preamp, ART 150 stereo amp and a TEA1S2 phono. The GAT and ART need to be built. The three pieces will be shipped at the same time and are expected in about 2 weeks.

I now need to purchase a new rack (or reconfigure my existing one), additional RCA interconnects and a couple of power cords. I will stick with Ansuz for cables. The rack question is currently unanswered.

Thanks for your assistance and that of the others. I’ll attempt to post some pics once the gear arrives.

Mike


Hi Puma Cat , FYI - my new CJ gear should ship Monday, 4/22/19. The pics below are of the GAT S2 as it was being assembled. It and the ART 150 are currently going through CJ’s five day burn-in and final Q/A process. I’ve also ordered 3 additional modular sections for my Raidho rack and additional Ansuz RCA interconnects and power cords. Those should arrive Monday as well. I’m looking forward to getting everything setup and beginning the lengthy burn-in process.

IMG_3687.jpggat3.jpggat4.jpggat5.jpg

Mike
Reply With Quote