Quote:
Originally Posted by Audio 1
Apparently the current lead time for Pass Labs is 10+ months, so you may want to consider this in your plans if waiting is unappealing.
|
Thanks. I can get a set in 2 months. Verified yesterday.
__________________
Jazz Junkie
Magico M3s; Vitus Masterpiece Components; TechDAS Air Force One; 2 x SME 3012-R; Airtight Opus 1 and MSL Platinum Signature; Taiko Audio Extreme + Switch; Albedo Metamorphosis Signature cables.
|